Centurian Tower – NBCC
Back to Portfolio

Column Jacketing

Centurian Tower – NBCC

LocationAmrapali, NCR
ClientNBCC (India) Limited
DurationCompleted
ScopeColumn Jacketing

The Challenge

High-rise residential tower columns required structural reinforcement due to identified deficiencies during quality audit, with the building partially occupied.

Engineering Solution

Executed systematic Micro Concrete jacketing with minimal surface preparation disruption. Applied Sika Rapid formulations to achieve accelerated curing and rapid return-to-service timelines.

Centurian Tower – NBCC detail
Next Project

Max Hospital – Patpadganj

Chat with us